You are in: Rob's OSM Stuff » UK PRoW » Progress » Derbyshire » Mapping Updates

OSM Status Updates for Derbyshire

This page lists rigths of way where the mapping status value stored in this tool appears to be inconsistent with what is mapped in OSM (and tagged with a prow_ref=* tag).

RoWs present with unmapped status set (DS imported)

No RoWs found with this issue

RoWs missing from OSM with mapped status set

No RoWs found with this issue

RoWs close to 100% length with mapped status set to incomplete

No RoWs found with this issue

RoWs not close to 100% length with mapped status set to complete

No RoWs found with this issue

RoWs with a bounding box mismatch and a mapped status set to complete

No RoWs found with this issue

RoWs outside the GIS bounding box and a mapped status set to incomplete

Parish Number LGIS LOSM ΔL/L MS LE Notes
Ashleyhay (Amber Valley) FP 5 1987 2130 +7.2% 0 6m
Ashleyhay (Amber Valley) FP 29 355 655 +84.5% 0 7y
Bolsover (Bolsover) FP 12 321 178 −44.5% 0 2y
Breaston (Erewash) FP 20 1513 2276 +50.4% 0 16m
Chapel en le Frith (High Peak) FP 91 255 327 +28.2% 0 2y
Chapel en le Frith (High Peak) FP 140 191 324 +69.6% 0 2y
Chapel en le Frith (High Peak) FP 156 114 695 +509.6% 0 2y
Chapel en le Frith (High Peak) BW 181 637 676 +6.1% 0 2y
Chinley, Buxworth and Brownside (High Peak) FP 102 643 863 +34.2% 0 4m
Eyam (Derbyshire Dales) RB 20 48 386 +704.2% 0 5m
Great Longstone (Derbyshire Dales) RB 51 350 1578 +350.9% 0 5m
Great Longstone (Derbyshire Dales) BW 53 43 993 +2209.3% 0 5m
Hartington Upper Quarter (High Peak) FP 30 996 115 −88.5% 0 5m
Hartington Upper Quarter (High Peak) FP 122 339 580 +71.1% 0 5m
Hayfield (High Peak) FP 44 191 203 +6.3% 0 2y
Hayfield (High Peak) FP 61 307 458 +49.2% 0 18m
Hayfield (High Peak) FP 85 47 170 +261.7% 0 3m
Idridgehay and Alton (Amber Valley) FP 14 617 700 +13.5% 0 7y
Idridgehay and Alton (Amber Valley) FP 37 243 467 +92.2% 0 2y
Ilkeston (Erewash) BW 50 594 676 +13.8% 0 2m
Ilkeston (Erewash) FP 111 223 585 +162.3% 0 2y
Long Eaton (Erewash) FP 16 30 83 +176.7% 0 2y
New Mills (High Peak) FP 2 358 429 +19.8% 0 2y
New Mills (High Peak) FP 14 332 941 +183.4% 0 2y
New Mills (High Peak) FP 22 142 253 +78.2% 0 2y
New Mills (High Peak) FP 52 211 267 +26.5% 0 2y
New Mills (High Peak) FP 61 477 1912 +300.8% 0 20m
New Mills (High Peak) FP 62 362 547 +51.1% 0 3m
New Mills (High Peak) FP 68 648 1411 +117.7% 0 2y
New Mills (High Peak) FP 77 910 518 −43.1% 0 8m
New Mills (High Peak) FP 167 297 439 +47.8% 0 2y
Ockbrook (Erewash) BW 4 1033 1186 +14.8% 0 5m
Sandiacre (Erewash) FP 8 377 606 +60.7% 0 2y
Stanton by Dale (Erewash) FP 18 1529 1213 −20.7% 0 16m
Tideswell (Derbyshire Dales) FP 33 579 1074 +85.5% 0 5m
West Hallam (Erewash) FP 19 1214 1754 +44.5% 0 16m
Whaley Bridge (High Peak) FP 70 2078 2446 +17.7% 0 3m

Mapped RoWs flagged as not following the definitive line

No RoWs found with this issue

RoWs present in parishes without Definitive Statement import

Parish Number LGIS LOSM ΔL/L MS LE Notes
Ashleyhay (Amber Valley) FP 1 590 605 +2.5% 0 3y
Ashleyhay (Amber Valley) FP 3 125 132 +5.6% 0 8y
Ashleyhay (Amber Valley) FP 4 365 339 −7.1% 0 3y
Ashleyhay (Amber Valley) FP 5 1987 2130 +7.2% 0 6m
Ashleyhay (Amber Valley) FP 6 1467 1458 −0.6% 0 2y
Ashleyhay (Amber Valley) FP 7 481 295 −38.7% 0 7y
Ashleyhay (Amber Valley) FP 8 327 88 −73.1% 0 2y
Ashleyhay (Amber Valley) FP 9 131 124 −5.3% 0 8y
Ashleyhay (Amber Valley) FP 10 547 561 +2.6% 0 3m
Ashleyhay (Amber Valley) FP 11 617 606 −1.8% 0 6y
Ashleyhay (Amber Valley) FP 12 483 448 −7.2% 0 3m
Ashleyhay (Amber Valley) FP 13 211 208 −1.4% 0 3m
Ashleyhay (Amber Valley) FP 14 443 452 +2.0% 0 8y
Ashleyhay (Amber Valley) FP 15 162 179 +10.5% 0 4m
Ashleyhay (Amber Valley) FP 17 1012 916 −9.5% 0 8y
Ashleyhay (Amber Valley) FP 18 154 187 +21.4% 0 8y
Ashleyhay (Amber Valley) FP 19 1144 1180 +3.1% 0 6y
Ashleyhay (Amber Valley) FP 20 129 139 +7.8% 0 8y
Ashleyhay (Amber Valley) FP 21 141 161 +14.2% 0 8y
Ashleyhay (Amber Valley) FP 22 862 880 +2.1% 0 6y
Ashleyhay (Amber Valley) FP 23 359 321 −10.6% 0 4m
Ashleyhay (Amber Valley) FP 24 106 114 +7.5% 0 8y
Ashleyhay (Amber Valley) FP 25 613 619 +1.0% 0 4m
Ashleyhay (Amber Valley) FP 28 466 471 +1.1% 0 4y
Ashleyhay (Amber Valley) FP 29 355 655 +84.5% 0 7y
Ashleyhay (Amber Valley) FP 30 431 444 +3.0% 0 7y
Ashleyhay (Amber Valley) FP 31 436 429 −1.6% 0 8y
Ashleyhay (Amber Valley) FP 32 356 363 +2.0% 0 8y
Bamford (High Peak) FP 4 882 593 −32.8% 0 5m
Bamford (High Peak) BOAT 18 375 271 −27.7% 0 4m
Barlborough (Bolsover) FP 22 540 30 −94.4% 0 5w
Bolsover (Bolsover) FP 12 321 178 −44.5% 0 2y
Breadsall (Erewash) FP 4 587 301 −48.7% 0 4w
Breadsall (Erewash) FP 6 206 214 +3.9% 0 4w
Breadsall (Erewash) FP 7 730 745 +2.1% 0 4w
Breaston (Erewash) FP 1 360 366 +1.7% 0 2y
Breaston (Erewash) BW 2 955 917 −4.0% 0 2y
Breaston (Erewash) FP 3 450 465 +3.3% 0 2y
Breaston (Erewash) FP 5 117 116 −0.9% 0 2y
Breaston (Erewash) FP 6 109 111 +1.8% 0 2y
Breaston (Erewash) FP 7 113 123 +8.8% 0 2y
Breaston (Erewash) FP 8 69 76 +10.1% 0 2y
Breaston (Erewash) FP 9 39 50 +28.2% 0 2y
Breaston (Erewash) FP 11 214 227 +6.1% 0 2y
Breaston (Erewash) FP 12 104 113 +8.7% 0 2y
Breaston (Erewash) FP 13 1489 1511 +1.5% 0 16m
Breaston (Erewash) FP 14 917 890 −2.9% 0 16m
Breaston (Erewash) FP 15 102 113 +10.8% 0 2y
Breaston (Erewash) FP 16 1076 1080 +0.4% 0 16m
Breaston (Erewash) FP 17 541 535 −1.1% 0 16m
Breaston (Erewash) FP 18 846 913 +7.9% 0 16m
Breaston (Erewash) FP 19 303 305 +0.7% 0 2y
Breaston (Erewash) FP 20 1513 2276 +50.4% 0 16m
Breaston (Erewash) FP 21 1256 1209 −3.7% 0 16m
Breaston (Erewash) FP 24 64 73 +14.1% 0 2y
Breaston (Erewash) FP 25 87 109 +25.3% 0 2y
Breaston (Erewash) FP 26 68 80 +17.6% 0 2y
Breaston (Erewash) FP 27 49 60 +22.4% 0 2y
Breaston (Erewash) FP 28 313 330 +5.4% 0 16m
Breaston (Erewash) FP 29 1035 1025 −1.0% 0 2y
Breaston (Erewash) BW 31 905 926 +2.3% 0 2y
Breaston (Erewash) FP 32 536 534 −0.4% 0 16m
Brushfield (Derbyshire Dales) FP 1 484 504 +4.1% 0 5m
Brushfield (Derbyshire Dales) BW 8 1088 1087 −0.1% 0 5m
Chapel en le Frith (High Peak) FP 8 157 156 −0.6% 0 2y
Chapel en le Frith (High Peak) FP 11 110 108 −1.8% 0 2y
Chapel en le Frith (High Peak) FP 13 547 544 −0.5% 0 18m
Chapel en le Frith (High Peak) FP 14 1257 1273 +1.3% 0 6y
Chapel en le Frith (High Peak) FP 15 973 624 −35.9% 0 6y
Chapel en le Frith (High Peak) FP 18 411 146 −64.5% 0 2y
Chapel en le Frith (High Peak) FP 22 350 119 −66.0% 0 2y
Chapel en le Frith (High Peak) FP 23 521 518 −0.6% 0 6y
Chapel en le Frith (High Peak) FP 51 191 192 +0.5% 0 6y
Chapel en le Frith (High Peak) FP 52 1476 1290 −12.6% 0 2y
Chapel en le Frith (High Peak) FP 54 464 419 −9.7% 0 4y
Chapel en le Frith (High Peak) FP 67 503 516 +2.6% 0 2y
Chapel en le Frith (High Peak) FP 72 62 77 +24.2% 0 2y
Chapel en le Frith (High Peak) FP 76 393 396 +0.8% 0 2y
Chapel en le Frith (High Peak) FP 91 255 327 +28.2% 0 2y
Chapel en le Frith (High Peak) FP 108 1388 656 −52.7% 0 5m
Chapel en le Frith (High Peak) FP 109 1882 883 −53.1% 0 2y
Chapel en le Frith (High Peak) FP 124 1203 1122 −6.7% 0 4m
Chapel en le Frith (High Peak) FP 132 153 157 +2.6% 0 2y
Chapel en le Frith (High Peak) FP 133 287 295 +2.8% 0 2y
Chapel en le Frith (High Peak) FP 134 24 25 +4.2% 0 2y
Chapel en le Frith (High Peak) FP 135 847 837 −1.2% 0 2y
Chapel en le Frith (High Peak) FP 136 542 552 +1.8% 0 3m
Chapel en le Frith (High Peak) FP 137 571 440 −22.9% 0 2y
Chapel en le Frith (High Peak) FP 140 191 324 +69.6% 0 2y
Chapel en le Frith (High Peak) FP 141 566 695 +22.8% 0 2y
Chapel en le Frith (High Peak) BOAT 144 1127 1137 +0.9% 0 23m
Chapel en le Frith (High Peak) FP 146 422 425 +0.7% 0 2y
Chapel en le Frith (High Peak) FP 149 399 391 −2.0% 0 6y
Chapel en le Frith (High Peak) FP 156 114 695 +509.6% 0 2y
Chapel en le Frith (High Peak) FP 157 82 94 +14.6% 0 2y
Chapel en le Frith (High Peak) FP 166 21 30 +42.9% 0 2y
Chapel en le Frith (High Peak) FP 167 120 121 +0.8% 0 2y
Chapel en le Frith (High Peak) FP 170 610 628 +3.0% 0 4m
Chapel en le Frith (High Peak) FP 171 246 252 +2.4% 0 4m
Chapel en le Frith (High Peak) FP 172 278 314 +12.9% 0 4m
Chapel en le Frith (High Peak) FP 173 69 69 +0.0% 0 2y
Chapel en le Frith (High Peak) FP 176 366 369 +0.8% 0 6y
Chapel en le Frith (High Peak) BW 181 637 676 +6.1% 0 2y
Chapel en le Frith (High Peak) BOAT 182 465 479 +3.0% 0 18m
Charlesworth (High Peak) FP 32 269 59 −78.1% 0 2y
Charlesworth (High Peak) FP 84 1445 442 −69.4% 0 2y
Chinley, Buxworth and Brownside (High Peak) FP 2 672 666 −0.9% 0 2y
Chinley, Buxworth and Brownside (High Peak) FP 3 166 159 −4.2% 0 2y
Chinley, Buxworth and Brownside (High Peak) FP 4 562 561 −0.2% 0 20m
Chinley, Buxworth and Brownside (High Peak) FP 5 234 240 +2.6% 0 2y
Chinley, Buxworth and Brownside (High Peak) FP 11 1272 1271 −0.1% 0 23m
Chinley, Buxworth and Brownside (High Peak) FP 16 1281 1098 −14.3% 0 2y
Chinley, Buxworth and Brownside (High Peak) FP 18 958 968 +1.0% 0 2y
Chinley, Buxworth and Brownside (High Peak) FP 19 564 566 +0.4% 0 2y
Chinley, Buxworth and Brownside (High Peak) FP 20 181 185 +2.2% 0 2y
Chinley, Buxworth and Brownside (High Peak) FP 21 258 272 +5.4% 0 2y
Chinley, Buxworth and Brownside (High Peak) FP 22 300 292 −2.7% 0 7w
Chinley, Buxworth and Brownside (High Peak) FP 23 205 238 +16.1% 0 7w
Chinley, Buxworth and Brownside (High Peak) BW 25 1011 1005 −0.6% 0 2y
Chinley, Buxworth and Brownside (High Peak) FP 26 2244 2245 +0.0% 0 7w
Chinley, Buxworth and Brownside (High Peak) FP 28 1282 1289 +0.5% 0 10m
Chinley, Buxworth and Brownside (High Peak) FP 29 415 109 −73.7% 0 2y
Chinley, Buxworth and Brownside (High Peak) FP 30 344 340 −1.2% 0 2y
Chinley, Buxworth and Brownside (High Peak) FP 56 406 406 +0.0% 0 2y
Chinley, Buxworth and Brownside (High Peak) FP 69 619 627 +1.3% 0 22m
Chinley, Buxworth and Brownside (High Peak) FP 73 83 90 +8.4% 0 2y
Chinley, Buxworth and Brownside (High Peak) FP 75 257 44 −82.9% 0 2y
Chinley, Buxworth and Brownside (High Peak) FP 77 293 300 +2.4% 0 2y
Chinley, Buxworth and Brownside (High Peak) FP 80 47 62 +31.9% 0 2y
Chinley, Buxworth and Brownside (High Peak) FP 83 262 243 −7.3% 0 2y
Chinley, Buxworth and Brownside (High Peak) FP 87 24 13 −45.8% 0 2y
Chinley, Buxworth and Brownside (High Peak) FP 88 844 847 +0.4% 0 2y
Chinley, Buxworth and Brownside (High Peak) FP 89 916 921 +0.5% 0 2y
Chinley, Buxworth and Brownside (High Peak) FP 90 153 150 −2.0% 0 2y
Chinley, Buxworth and Brownside (High Peak) FP 91 454 133 −70.7% 0 2y
Chinley, Buxworth and Brownside (High Peak) FP 92 171 186 +8.8% 0 2y
Chinley, Buxworth and Brownside (High Peak) FP 93 165 188 +13.9% 0 2y
Chinley, Buxworth and Brownside (High Peak) FP 94 321 325 +1.2% 0 2y
Chinley, Buxworth and Brownside (High Peak) FP 95 39 39 +0.0% 0 2y
Chinley, Buxworth and Brownside (High Peak) FP 96 300 160 −46.7% 0 2y
Chinley, Buxworth and Brownside (High Peak) FP 97 235 224 −4.7% 0 2y
Chinley, Buxworth and Brownside (High Peak) FP 98 256 262 +2.3% 0 2y
Chinley, Buxworth and Brownside (High Peak) FP 99 199 201 +1.0% 0 2y
Chinley, Buxworth and Brownside (High Peak) FP 100 115 128 +11.3% 0 2y
Chinley, Buxworth and Brownside (High Peak) FP 101 28 33 +17.9% 0 2y
Chinley, Buxworth and Brownside (High Peak) FP 102 643 863 +34.2% 0 4m
Chinley, Buxworth and Brownside (High Peak) FP 103 47 42 −10.6% 0 2y
Dalbury Lees (South Derbyshire) FP 16 592 601 +1.5% 0 2y
Dale Abbey (Erewash) FP 1 662 697 +5.3% 0 2y
Dale Abbey (Erewash) FP 2 1722 1768 +2.7% 0 16m
Dale Abbey (Erewash) FP 3 216 218 +0.9% 0 2y
Dale Abbey (Erewash) FP 4 855 869 +1.6% 0 2y
Dale Abbey (Erewash) FP 5 253 269 +6.3% 0 2y
Dale Abbey (Erewash) FP 6 641 642 +0.2% 0 2y
Dale Abbey (Erewash) FP 7 550 553 +0.5% 0 2y
Dale Abbey (Erewash) BW 8 658 665 +1.1% 0 2y
Dale Abbey (Erewash) BW 9 408 399 −2.2% 0 2y
Dale Abbey (Erewash) FP 10 295 286 −3.1% 0 2y
Dale Abbey (Erewash) FP 11 1343 1341 −0.1% 0 2y
Dale Abbey (Erewash) FP 12 278 281 +1.1% 0 2y
Dale Abbey (Erewash) FP 13 41 40 −2.4% 0 2y
Dale Abbey (Erewash) FP 14 882 164 −81.4% 0 2y
Dale Abbey (Erewash) FP 15 626 623 −0.5% 0 2y
Dale Abbey (Erewash) BW 17 878 886 +0.9% 0 14m
Dale Abbey (Erewash) FP 18 218 208 −4.6% 0 2y
Dale Abbey (Erewash) FP 31 550 498 −9.5% 0 16m
Dale Abbey (Erewash) FP 33 688 699 +1.6% 0 2y
Dale Abbey (Erewash) FP 34 298 327 +9.7% 0 2y
Dale Abbey (Erewash) FP 35 1934 1964 +1.6% 0 14m
Dale Abbey (Erewash) FP 36 102 111 +8.8% 0 14m
Dale Abbey (Erewash) FP 37 479 492 +2.7% 0 16m
Dale Abbey (Erewash) FP 38 957 975 +1.9% 0 2y
Dale Abbey (Erewash) FP 39 236 234 −0.8% 0 2y
Dale Abbey (Erewash) FP 40 420 387 −7.9% 0 2y
Dale Abbey (Erewash) FP 41 120 134 +11.7% 0 2y
Dale Abbey (Erewash) FP 42 101 100 −1.0% 0 2y
Dale Abbey (Erewash) FP 43 379 374 −1.3% 0 2y
Dale Abbey (Erewash) FP 44 211 220 +4.3% 0 2y
Dale Abbey (Erewash) FP 45 613 617 +0.7% 0 2y
Dale Abbey (Erewash) FP 46 686 476 −30.6% 0 2y
Dale Abbey (Erewash) FP 47 210 217 +3.3% 0 2y
Dale Abbey (Erewash) FP 48 55 88 +60.0% 0 2y
Dale Abbey (Erewash) FP 49 454 448 −1.3% 0 2y
Dale Abbey (Erewash) BW 52 250 260 +4.0% 0 2y
Dale Abbey (Erewash) RB 53 933 933 +0.0% 0 2y
Dale Abbey (Erewash) RB 54 63 83 +31.7% 0 2y
Dale Abbey (Erewash) FP 55 904 913 +1.0% 0 17m
Dale Abbey (Erewash) RB 56 1336 1338 +0.1% 0 17m
Dale Abbey (Erewash) FP 57 739 739 +0.0% 0 17m
Dale Abbey (Erewash) FP 60 59 67 +13.6% 0 16m
Dale Abbey (Erewash) FP 61 26 32 +23.1% 0 16m
Dale Abbey (Erewash) FP 62 55 65 +18.2% 0 4m
Darley Dale (Derbyshire Dales) FP 62 319 325 +1.9% 0 2y
Draycott and Church Wilne (Erewash) FP 1 1050 1065 +1.4% 0 2y
Draycott and Church Wilne (Erewash) FP 2 427 488 +14.3% 0 2y
Draycott and Church Wilne (Erewash) BW 3 409 328 −19.8% 0 2y
Draycott and Church Wilne (Erewash) FP 4 723 735 +1.7% 0 2y
Draycott and Church Wilne (Erewash) FP 5 232 265 +14.2% 0 2y
Draycott and Church Wilne (Erewash) FP 6 264 119 −54.9% 0 2y
Draycott and Church Wilne (Erewash) FP 7 1260 518 −58.9% 0 2y
Draycott and Church Wilne (Erewash) FP 9 419 437 +4.3% 0 2y
Draycott and Church Wilne (Erewash) FP 10 955 964 +0.9% 0 2y
Draycott and Church Wilne (Erewash) BW 11 739 760 +2.8% 0 2y
Draycott and Church Wilne (Erewash) FP 12 240 252 +5.0% 0 2y
Draycott and Church Wilne (Erewash) FP 14 2259 2260 +0.0% 0 4m
Draycott and Church Wilne (Erewash) FP 15 63 75 +19.0% 0 2y
Draycott and Church Wilne (Erewash) FP 16 61 76 +24.6% 0 2y
Draycott and Church Wilne (Erewash) FP 17 48 59 +22.9% 0 2y
Draycott and Church Wilne (Erewash) FP 18 534 531 −0.6% 0 2y
Draycott and Church Wilne (Erewash) FP 19 22 6 −72.7% 0 2y
Duffield (Amber Valley) BW 1 894 894 +0.0% 0 9m
Eckington (North East Derbyshire) FP 71 231 196 −15.2% 0 2y
Eckington (North East Derbyshire) FP 72 40 50 +25.0% 0 2y
Eckington (North East Derbyshire) FP 73 122 129 +5.7% 0 2y
Eckington (North East Derbyshire) BW 75 1228 1262 +2.8% 0 7w
Eckington (North East Derbyshire) FP 76 318 309 −2.8% 0 3m
Eckington (North East Derbyshire) FP 77 416 396 −4.8% 0 3m
Eckington (North East Derbyshire) FP 149 149 160 +7.4% 0 2y
Eckington (North East Derbyshire) FP 154 136 148 +8.8% 0 2y
Eckington (North East Derbyshire) FP 168 128 144 +12.5% 0 2y
Eckington (North East Derbyshire) FP 169 58 71 +22.4% 0 2y
Eckington (North East Derbyshire) FP 173 155 169 +9.0% 0 3m
Edale (High Peak) FP 1 328 322 −1.8% 0 5m
Edale (High Peak) BOAT 16 1887 1898 +0.6% 0 2m
Edale (High Peak) BW 19 2121 1998 −5.8% 0 5m
Elvaston (South Derbyshire) FP 1 560 572 +2.1% 0 2y
Elvaston (South Derbyshire) FP 11 145 146 +0.7% 0 2y
Eyam (Derbyshire Dales) RB 20 48 386 +704.2% 0 5m
Eyam (Derbyshire Dales) FP 28 462 478 +3.5% 0 5m
Eyam (Derbyshire Dales) BOAT 34 176 171 −2.8% 0 5m
Great Longstone (Derbyshire Dales) BOAT 49 153 165 +7.8% 0 5m
Great Longstone (Derbyshire Dales) RB 51 350 1578 +350.9% 0 5m
Great Longstone (Derbyshire Dales) BW 53 43 993 +2209.3% 0 5m
Hartington Town Quarter (Derbyshire Dales) FP 28 327 329 +0.6% 0 5m
Hartington Town Quarter (Derbyshire Dales) BOAT 34 660 624 −5.5% 0 5m
Hartington Upper Quarter (High Peak) FP 19 713 671 −5.9% 0 5m
Hartington Upper Quarter (High Peak) BW 21 1356 831 −38.7% 0 5m
Hartington Upper Quarter (High Peak) FP 23 497 361 −27.4% 0 5m
Hartington Upper Quarter (High Peak) FP 25 476 478 +0.4% 0 5m
Hartington Upper Quarter (High Peak) FP 28 485 494 +1.9% 0 2m
Hartington Upper Quarter (High Peak) FP 29 1769 452 −74.4% 0 2m
Hartington Upper Quarter (High Peak) FP 30 996 115 −88.5% 0 5m
Hartington Upper Quarter (High Peak) FP 31 1757 188 −89.3% 0 2m
Hartington Upper Quarter (High Peak) FP 101 752 765 +1.7% 0 2m
Hartington Upper Quarter (High Peak) FP 111 752 749 −0.4% 0 2y
Hartington Upper Quarter (High Peak) FP 112 498 508 +2.0% 0 2y
Hartington Upper Quarter (High Peak) FP 113 312 325 +4.2% 0 2y
Hartington Upper Quarter (High Peak) FP 122 339 580 +71.1% 0 5m
Hartington Upper Quarter (High Peak) FP 145 370 373 +0.8% 0 6y
Hassop (Derbyshire Dales) RB 6 1558 1581 +1.5% 0 5m
Hassop (Derbyshire Dales) BW 13 17 21 +23.5% 0 5m
Hathersage (Derbyshire Dales) BW 85 902 871 −3.4% 0 8d
Hayfield (High Peak) BW 1 1908 1298 −32.0% 0 18m
Hayfield (High Peak) FP 2 553 560 +1.3% 0 2y
Hayfield (High Peak) FP 3 727 733 +0.8% 0 18m
Hayfield (High Peak) FP 4 1371 1201 −12.4% 0 2y
Hayfield (High Peak) BW 5 1132 1153 +1.9% 0 18m
Hayfield (High Peak) BW 6 294 285 −3.1% 0 2y
Hayfield (High Peak) BW 8 1617 1580 −2.3% 0 18m
Hayfield (High Peak) FP 9 257 253 −1.6% 0 2y
Hayfield (High Peak) BW 10 1310 1317 +0.5% 0 7w
Hayfield (High Peak) FP 11 518 538 +3.9% 0 2y
Hayfield (High Peak) FP 12 167 191 +14.4% 0 2y
Hayfield (High Peak) FP 16 418 417 −0.2% 0 3m
Hayfield (High Peak) FP 17 286 215 −24.8% 0 2y
Hayfield (High Peak) BW 18 3298 2833 −14.1% 0 2y
Hayfield (High Peak) FP 19 1393 1272 −8.7% 0 2y
Hayfield (High Peak) FP 20 2559 2491 −2.7% 0 4m
Hayfield (High Peak) FP 21 1028 906 −11.9% 0 2y
Hayfield (High Peak) FP 22 452 440 −2.7% 0 2y
Hayfield (High Peak) FP 23 868 698 −19.6% 0 2y
Hayfield (High Peak) FP 24 592 582 −1.7% 0 2y
Hayfield (High Peak) FP 25 616 162 −73.7% 0 2y
Hayfield (High Peak) FP 26 903 385 −57.4% 0 2y
Hayfield (High Peak) FP 27 461 429 −6.9% 0 2y
Hayfield (High Peak) FP 28 66 75 +13.6% 0 2y
Hayfield (High Peak) FP 29 42 53 +26.2% 0 2y
Hayfield (High Peak) FP 30 698 682 −2.3% 0 2y
Hayfield (High Peak) FP 31 229 225 −1.7% 0 2y
Hayfield (High Peak) FP 32 809 603 −25.5% 0 2y
Hayfield (High Peak) FP 33 404 336 −16.8% 0 2y
Hayfield (High Peak) BW 34 529 536 +1.3% 0 2y
Hayfield (High Peak) FP 35 171 157 −8.2% 0 2y
Hayfield (High Peak) FP 36 157 152 −3.2% 0 2y
Hayfield (High Peak) FP 37 629 636 +1.1% 0 2y
Hayfield (High Peak) FP 40 173 171 −1.2% 0 2y
Hayfield (High Peak) FP 42 351 337 −4.0% 0 23m
Hayfield (High Peak) FP 43 281 298 +6.0% 0 2y
Hayfield (High Peak) FP 44 191 203 +6.3% 0 2y
Hayfield (High Peak) FP 45 92 86 −6.5% 0 2y
Hayfield (High Peak) BW 47 3426 2515 −26.6% 0 5m
Hayfield (High Peak) FP 48 1201 1210 +0.7% 0 18m
Hayfield (High Peak) BW 49 269 272 +1.1% 0 2y
Hayfield (High Peak) BW 50 1443 1264 −12.4% 0 7w
Hayfield (High Peak) FP 51 587 569 −3.1% 0 16m
Hayfield (High Peak) FP 52 54 59 +9.3% 0 23m
Hayfield (High Peak) BW 53 1464 1506 +2.9% 0 18m
Hayfield (High Peak) FP 55 956 787 −17.7% 0 18m
Hayfield (High Peak) FP 56 432 404 −6.5% 0 18m
Hayfield (High Peak) FP 57 2485 2144 −13.7% 0 18m
Hayfield (High Peak) FP 58 814 823 +1.1% 0 17m
Hayfield (High Peak) FP 60 1994 1862 −6.6% 0 7w
Hayfield (High Peak) FP 61 307 458 +49.2% 0 18m
Hayfield (High Peak) FP 62 297 300 +1.0% 0 5m
Hayfield (High Peak) BW 63 2551 2133 −16.4% 0 5m
Hayfield (High Peak) BW 64 1924 2000 +4.0% 0 10m
Hayfield (High Peak) FP 65 473 479 +1.3% 0 2y
Hayfield (High Peak) BW 66 1292 947 −26.7% 0 2y
Hayfield (High Peak) FP 67 187 207 +10.7% 0 18m
Hayfield (High Peak) FP 68 139 137 −1.4% 0 2y
Hayfield (High Peak) BW 71 2376 1828 −23.1% 0 7w
Hayfield (High Peak) BW 72 2667 1385 −48.1% 0 5m
Hayfield (High Peak) FP 73 37 44 +18.9% 0 2y
Hayfield (High Peak) FP 74 18 22 +22.2% 0 2y
Hayfield (High Peak) FP 77 74 79 +6.8% 0 2y
Hayfield (High Peak) FP 78 5050 4031 −20.2% 0 13m
Hayfield (High Peak) BW 80 42 45 +7.1% 0 3m
Hayfield (High Peak) BW 81 1595 1613 +1.1% 0 4m
Hayfield (High Peak) FP 82 342 352 +2.9% 0 5m
Hayfield (High Peak) FP 85 47 170 +261.7% 0 3m
Hayfield (High Peak) FP 91 920 919 −0.1% 0 4m
Hayfield (High Peak) FP 94 783 782 −0.1% 0 18m
Heanor and Loscoe (Amber Valley) BW 100 100 88 −12.0% 0 2y
Holbrook (Amber Valley) BW 18 221 217 −1.8% 0 9m
Holmesfield (North East Derbyshire) BW 60 2274 2314 +1.8% 0 6w
Holmesfield (North East Derbyshire) BW 61 450 436 −3.1% 0 5m
Holmesfield (North East Derbyshire) BW 62 694 661 −4.8% 0 5m
Holmesfield (North East Derbyshire) BW 64 1213 261 −78.5% 0 5m
Hopwell (Erewash) BW 1 640 618 −3.4% 0 7m
Hopwell (Erewash) FP 2 649 572 −11.9% 0 2y
Hopwell (Erewash) FP 3 166 163 −1.8% 0 2y
Hopwell (Erewash) FP 4 1070 1096 +2.4% 0 13m
Hopwell (Erewash) FP 5 112 106 −5.4% 0 2y
Hopwell (Erewash) FP 6 1684 1687 +0.2% 0 2y
Hopwell (Erewash) FP 7 312 310 −0.6% 0 2y
Hopwell (Erewash) FP 8 890 905 +1.7% 0 2y
Hopwell (Erewash) FP 9 258 219 −15.1% 0 2y
Hopwell (Erewash) BW 10 2495 2502 +0.3% 0 2y
Hopwell (Erewash) FP 12 90 89 −1.1% 0 2y
Horsley (Amber Valley) BW 28 182 177 −2.7% 0 14m
Idridgehay and Alton (Amber Valley) FP 1 575 594 +3.3% 0 2y
Idridgehay and Alton (Amber Valley) FP 2 113 126 +11.5% 0 2y
Idridgehay and Alton (Amber Valley) FP 3 712 716 +0.6% 0 7y
Idridgehay and Alton (Amber Valley) FP 4 394 396 +0.5% 0 8y
Idridgehay and Alton (Amber Valley) FP 5 191 216 +13.1% 0 8y
Idridgehay and Alton (Amber Valley) FP 6 551 567 +2.9% 0 2y
Idridgehay and Alton (Amber Valley) FP 7 314 318 +1.3% 0 8y
Idridgehay and Alton (Amber Valley) FP 8 257 257 +0.0% 0 8y
Idridgehay and Alton (Amber Valley) FP 9 550 549 −0.2% 0 8y
Idridgehay and Alton (Amber Valley) FP 10 706 726 +2.8% 0 8y
Idridgehay and Alton (Amber Valley) FP 11 557 530 −4.8% 0 8y
Idridgehay and Alton (Amber Valley) FP 12 427 449 +5.2% 0 8y
Idridgehay and Alton (Amber Valley) FP 13 441 448 +1.6% 0 8y
Idridgehay and Alton (Amber Valley) FP 14 617 700 +13.5% 0 7y
Idridgehay and Alton (Amber Valley) FP 15 518 519 +0.2% 0 8y
Idridgehay and Alton (Amber Valley) FP 16 780 801 +2.7% 0 8y
Idridgehay and Alton (Amber Valley) FP 17 579 559 −3.5% 0 2y
Idridgehay and Alton (Amber Valley) FP 18 602 582 −3.3% 0 8y
Idridgehay and Alton (Amber Valley) FP 19 280 25 −91.1% 0 2y
Idridgehay and Alton (Amber Valley) FP 20 192 200 +4.2% 0 8y
Idridgehay and Alton (Amber Valley) FP 21 405 447 +10.4% 0 3y
Idridgehay and Alton (Amber Valley) FP 22 811 825 +1.7% 0 2y
Idridgehay and Alton (Amber Valley) FP 23 814 809 −0.6% 0 2y
Idridgehay and Alton (Amber Valley) FP 24 548 272 −50.4% 0 2y
Idridgehay and Alton (Amber Valley) FP 27 438 442 +0.9% 0 3y
Idridgehay and Alton (Amber Valley) FP 28 776 459 −40.9% 0 4m
Idridgehay and Alton (Amber Valley) FP 29 1075 236 −78.0% 0 8y
Idridgehay and Alton (Amber Valley) FP 30 233 243 +4.3% 0 7y
Idridgehay and Alton (Amber Valley) FP 31 664 260 −60.8% 0 7y
Idridgehay and Alton (Amber Valley) FP 32 164 187 +14.0% 0 4m
Idridgehay and Alton (Amber Valley) FP 33 553 556 +0.5% 0 7y
Idridgehay and Alton (Amber Valley) FP 34 560 634 +13.2% 0 2y
Idridgehay and Alton (Amber Valley) FP 35 487 445 −8.6% 0 7y
Idridgehay and Alton (Amber Valley) FP 36 325 303 −6.8% 0 7y
Idridgehay and Alton (Amber Valley) FP 37 243 467 +92.2% 0 2y
Idridgehay and Alton (Amber Valley) FP 38 384 384 +0.0% 0 8y
Idridgehay and Alton (Amber Valley) FP 39 288 300 +4.2% 0 2y
Idridgehay and Alton (Amber Valley) FP 40 576 514 −10.8% 0 4y
Idridgehay and Alton (Amber Valley) BW 41 446 226 −49.3% 0 2y
Idridgehay and Alton (Amber Valley) FP 42 71 54 −23.9% 0 4m
Idridgehay and Alton (Amber Valley) FP 43 522 534 +2.3% 0 8y
Idridgehay and Alton (Amber Valley) FP 45 213 233 +9.4% 0 4m
Idridgehay and Alton (Amber Valley) FP 46 184 197 +7.1% 0 8y
Ilkeston (Erewash) BW 3 546 588 +7.7% 0 2y
Ilkeston (Erewash) FP 7 72 68 −5.6% 0 2y
Ilkeston (Erewash) FP 8 234 251 +7.3% 0 2y
Ilkeston (Erewash) BW 9 351 345 −1.7% 0 13m
Ilkeston (Erewash) FP 10 147 166 +12.9% 0 2y
Ilkeston (Erewash) FP 11 806 249 −69.1% 0 2y
Ilkeston (Erewash) FP 12 186 201 +8.1% 0 2y
Ilkeston (Erewash) FP 13 192 198 +3.1% 0 2y
Ilkeston (Erewash) FP 14 165 175 +6.1% 0 2y
Ilkeston (Erewash) FP 15 17 26 +52.9% 0 2y
Ilkeston (Erewash) FP 16 664 674 +1.5% 0 2y
Ilkeston (Erewash) FP 17 64 93 +45.3% 0 2y
Ilkeston (Erewash) FP 18 130 143 +10.0% 0 2y
Ilkeston (Erewash) FP 19 310 318 +2.6% 0 15m
Ilkeston (Erewash) FP 20 70 82 +17.1% 0 15m
Ilkeston (Erewash) FP 21 598 543 −9.2% 0 2y
Ilkeston (Erewash) FP 22 84 88 +4.8% 0 2y
Ilkeston (Erewash) FP 23 588 599 +1.9% 0 2y
Ilkeston (Erewash) FP 24 80 92 +15.0% 0 2y
Ilkeston (Erewash) FP 26 205 218 +6.3% 0 2y
Ilkeston (Erewash) FP 27 807 738 −8.6% 0 2y
Ilkeston (Erewash) FP 28 428 429 +0.2% 0 2y
Ilkeston (Erewash) FP 29 272 282 +3.7% 0 2y
Ilkeston (Erewash) FP 30 42 52 +23.8% 0 2y
Ilkeston (Erewash) FP 31 86 94 +9.3% 0 2y
Ilkeston (Erewash) FP 32 437 455 +4.1% 0 2y
Ilkeston (Erewash) FP 33 57 53 −7.0% 0 2y
Ilkeston (Erewash) FP 36 20 32 +60.0% 0 2y
Ilkeston (Erewash) FP 37 634 307 −51.6% 0 2y
Ilkeston (Erewash) FP 38 26 29 +11.5% 0 2y
Ilkeston (Erewash) FP 39 112 114 +1.8% 0 2y
Ilkeston (Erewash) FP 40 771 776 +0.6% 0 2y
Ilkeston (Erewash) FP 41 22 35 +59.1% 0 2y
Ilkeston (Erewash) FP 42 407 399 −2.0% 0 2y
Ilkeston (Erewash) FP 43 422 353 −16.4% 0 2y
Ilkeston (Erewash) FP 44 230 236 +2.6% 0 2y
Ilkeston (Erewash) FP 45 66 80 +21.2% 0 2y
Ilkeston (Erewash) FP 48 68 82 +20.6% 0 2y
Ilkeston (Erewash) FP 49 94 103 +9.6% 0 2y
Ilkeston (Erewash) BW 50 594 676 +13.8% 0 2m
Ilkeston (Erewash) FP 51 95 105 +10.5% 0 2y
Ilkeston (Erewash) FP 54 295 330 +11.9% 0 2y
Ilkeston (Erewash) FP 56 122 131 +7.4% 0 2y
Ilkeston (Erewash) FP 57 91 97 +6.6% 0 2y
Ilkeston (Erewash) FP 58 174 85 −51.1% 0 15m
Ilkeston (Erewash) FP 59 330 74 −77.6% 0 15m
Ilkeston (Erewash) FP 62 63 67 +6.3% 0 16m
Ilkeston (Erewash) FP 63 65 112 +72.3% 0 15m
Ilkeston (Erewash) FP 64 120 134 +11.7% 0 2y
Ilkeston (Erewash) FP 65 183 203 +10.9% 0 15m
Ilkeston (Erewash) FP 66 56 68 +21.4% 0 15m
Ilkeston (Erewash) FP 67 103 114 +10.7% 0 2y
Ilkeston (Erewash) FP 70 90 101 +12.2% 0 15m
Ilkeston (Erewash) FP 72 92 102 +10.9% 0 15m
Ilkeston (Erewash) FP 73 75 87 +16.0% 0 15m
Ilkeston (Erewash) FP 74 234 248 +6.0% 0 15m
Ilkeston (Erewash) FP 75 158 160 +1.3% 0 15m
Ilkeston (Erewash) FP 77 75 78 +4.0% 0 2y
Ilkeston (Erewash) FP 78 286 291 +1.7% 0 2y
Ilkeston (Erewash) FP 79 328 292 −11.0% 0 2m
Ilkeston (Erewash) FP 81 7142 7122 −0.3% 0 2y
Ilkeston (Erewash) FP 82 452 462 +2.2% 0 7m
Ilkeston (Erewash) FP 83 107 124 +15.9% 0 2y
Ilkeston (Erewash) FP 85 130 143 +10.0% 0 15m
Ilkeston (Erewash) FP 86 116 127 +9.5% 0 15m
Ilkeston (Erewash) FP 87 22 28 +27.3% 0 2y
Ilkeston (Erewash) FP 88 135 140 +3.7% 0 2y
Ilkeston (Erewash) FP 89 155 167 +7.7% 0 2y
Ilkeston (Erewash) FP 90 46 55 +19.6% 0 2y
Ilkeston (Erewash) FP 92 73 71 −2.7% 0 2y
Ilkeston (Erewash) FP 93 36 44 +22.2% 0 2y
Ilkeston (Erewash) FP 94 39 29 −25.6% 0 2y
Ilkeston (Erewash) FP 96 106 131 +23.6% 0 2y
Ilkeston (Erewash) FP 97 258 270 +4.7% 0 2y
Ilkeston (Erewash) FP 98 75 84 +12.0% 0 2y
Ilkeston (Erewash) FP 99 69 80 +15.9% 0 2y
Ilkeston (Erewash) FP 100 121 131 +8.3% 0 2y
Ilkeston (Erewash) FP 101 54 64 +18.5% 0 2y
Ilkeston (Erewash) FP 102 32 42 +31.2% 0 2y
Ilkeston (Erewash) FP 103 1246 685 −45.0% 0 16m
Ilkeston (Erewash) FP 104 936 946 +1.1% 0 16m
Ilkeston (Erewash) FP 105 21 20 −4.8% 0 2y
Ilkeston (Erewash) FP 106 24 23 −4.2% 0 2y
Ilkeston (Erewash) FP 107 74 85 +14.9% 0 2y
Ilkeston (Erewash) FP 108 48 61 +27.1% 0 2y
Ilkeston (Erewash) FP 111 223 585 +162.3% 0 2y
Ilkeston (Erewash) FP 112 272 284 +4.4% 0 2y
Ilkeston (Erewash) FP 113 63 74 +17.5% 0 2y
Ilkeston (Erewash) FP 114 94 96 +2.1% 0 2y
Ilkeston (Erewash) FP 115 24 25 +4.2% 0 2y
Ilkeston (Erewash) FP 116 14 11 −21.4% 0 2y
Ilkeston (Erewash) FP 117 69 70 +1.4% 0 2y
Ilkeston (Erewash) FP 119 8 19 +137.5% 0 2y
Ilkeston (Erewash) FP 120 6 6 +0.0% 0 2y
Ilkeston (Erewash) FP 121 8 12 +50.0% 0 2y
Ilkeston (Erewash) FP 122 14 24 +71.4% 0 15m
Ilkeston (Erewash) BW 123 183 185 +1.1% 0 2y
Ilkeston (Erewash) FP 125 36 28 −22.2% 0 2y
Ilkeston (Erewash) FP 126 7 7 +0.0% 0 15m
Langwith (Bolsover) FP 1 296 290 −2.0% 0 20m
Langwith (Bolsover) BW 2 1923 1939 +0.8% 0 20m
Little Eaton (Erewash) BW 6 178 178 +0.0% 0 14m
Little Eaton (Erewash) RB 18 332 336 +1.2% 0 9m
Little Eaton (Erewash) FP 19 889 902 +1.5% 0 9m
Little Eaton (Erewash) BW 25 419 397 −5.3% 0 9m
Little Eaton (Erewash) BW 30 182 197 +8.2% 0 2m
Little Eaton (Erewash) BW 31 81 96 +18.5% 0 14m
Little Eaton (Erewash) BW 33 20 29 +45.0% 0 9m
Little Eaton (Erewash) FP 35 112 114 +1.8% 0 9m
Little Longstone (Derbyshire Dales) BW 8 475 482 +1.5% 0 5m
Little Longstone (Derbyshire Dales) FP 10 2166 693 −68.0% 0 5m
Little Longstone (Derbyshire Dales) FP 12 433 408 −5.8% 0 5m
Little Longstone (Derbyshire Dales) FP 13 173 173 +0.0% 0 5m
Little Longstone (Derbyshire Dales) BOAT 14 1626 1579 −2.9% 0 5m
Little Longstone (Derbyshire Dales) BW 16 1582 1065 −32.7% 0 5m
Long Eaton (Erewash) FP 2 40 48 +20.0% 0 2y
Long Eaton (Erewash) FP 3 949 954 +0.5% 0 11m
Long Eaton (Erewash) FP 4 388 390 +0.5% 0 2y
Long Eaton (Erewash) FP 5 93 105 +12.9% 0 2y
Long Eaton (Erewash) FP 7 759 135 −82.2% 0 2y
Long Eaton (Erewash) FP 9 726 744 +2.5% 0 19m
Long Eaton (Erewash) FP 11 129 131 +1.6% 0 2y
Long Eaton (Erewash) FP 12 3865 3867 +0.1% 0 22m
Long Eaton (Erewash) FP 13 173 186 +7.5% 0 2y
Long Eaton (Erewash) FP 15 62 66 +6.5% 0 2m
Long Eaton (Erewash) FP 16 30 83 +176.7% 0 2y
Long Eaton (Erewash) FP 17 333 344 +3.3% 0 2m
Long Eaton (Erewash) FP 19 87 99 +13.8% 0 2y
Long Eaton (Erewash) FP 32 14 16 +14.3% 0 2y
Long Eaton (Erewash) FP 33 3272 3270 −0.1% 0 22m
Long Eaton (Erewash) FP 34 51 58 +13.7% 0 2y
Long Eaton (Erewash) FP 35 43 53 +23.3% 0 2y
Long Eaton (Erewash) FP 36 43 57 +32.6% 0 2y
Long Eaton (Erewash) FP 40 386 394 +2.1% 0 2y
Long Eaton (Erewash) FP 43 457 472 +3.3% 0 2y
Long Eaton (Erewash) FP 47 552 560 +1.4% 0 2y
Long Eaton (Erewash) FP 50 60 71 +18.3% 0 2m
Long Eaton (Erewash) FP 55 71 87 +22.5% 0 2y
Long Eaton (Erewash) FP 56 141 154 +9.2% 0 2y
Long Eaton (Erewash) FP 57 111 121 +9.0% 0 2y
Long Eaton (Erewash) FP 58 25 29 +16.0% 0 2y
Long Eaton (Erewash) FP 59 146 148 +1.4% 0 2y
Long Eaton (Erewash) FP 60 157 151 −3.8% 0 2y
Long Eaton (Erewash) FP 61 83 96 +15.7% 0 2m
Long Eaton (Erewash) FP 62 76 86 +13.2% 0 2y
Long Eaton (Erewash) FP 63 77 92 +19.5% 0 2m
Long Eaton (Erewash) FP 64 109 203 +86.2% 0 2y
Long Eaton (Erewash) FP 65 54 79 +46.3% 0 2y
Long Eaton (Erewash) FP 66 21 30 +42.9% 0 2y
Long Eaton (Erewash) BW 67 301 317 +5.3% 0 2y
Long Eaton (Erewash) FP 68 799 759 −5.0% 0 13m
Long Eaton (Erewash) FP 69 9 22 +144.4% 0 2y
Long Eaton (Erewash) FP 72 362 374 +3.3% 0 2y
Long Eaton (Erewash) FP 73 107 118 +10.3% 0 2m
Long Eaton (Erewash) FP 75 82 92 +12.2% 0 2y
Long Eaton (Erewash) FP 76 89 100 +12.4% 0 2y
Long Eaton (Erewash) FP 77 137 149 +8.8% 0 2y
Long Eaton (Erewash) FP 79 38 51 +34.2% 0 2y
Long Eaton (Erewash) FP 80 49 60 +22.4% 0 2y
Mapperley (Amber Valley) BW 1 330 330 +0.0% 0 2y
Mapperley (Amber Valley) BW 2 439 433 −1.4% 0 3m
Mapperley (Amber Valley) BW 3 594 595 +0.2% 0 5m
Mapperley (Amber Valley) FP 7 712 709 −0.4% 0 2y
Mapperley (Amber Valley) FP 13 439 438 −0.2% 0 2y
Mapperley (Amber Valley) FP 25 47 36 −23.4% 0 2y
Mapperley (Amber Valley) BW 26 41 38 −7.3% 0 4m
Mapperley (Amber Valley) BW 27 548 555 +1.3% 0 2y
Mapperley (Amber Valley) BW 28 366 376 +2.7% 0 2y
Monyash (Derbyshire Dales) FP 15 2795 1749 −37.4% 0 5m
Monyash (Derbyshire Dales) FP 20 2043 2064 +1.0% 0 5m
Monyash (Derbyshire Dales) BOAT 29 2929 2949 +0.7% 0 4m
New Mills (High Peak) FP 1 1049 1052 +0.3% 0 2y
New Mills (High Peak) FP 2 358 429 +19.8% 0 2y
New Mills (High Peak) FP 5 197 189 −4.1% 0 4m
New Mills (High Peak) FP 6 1424 1432 +0.6% 0 20m
New Mills (High Peak) FP 7 704 440 −37.5% 0 2y
New Mills (High Peak) FP 8 686 636 −7.3% 0 20m
New Mills (High Peak) FP 9 1723 1363 −20.9% 0 2y
New Mills (High Peak) FP 11 814 207 −74.6% 0 20m
New Mills (High Peak) FP 12 332 329 −0.9% 0 20m
New Mills (High Peak) FP 13 922 914 −0.9% 0 2y
New Mills (High Peak) FP 14 332 941 +183.4% 0 2y
New Mills (High Peak) FP 15 850 693 −18.5% 0 20m
New Mills (High Peak) FP 16 263 261 −0.8% 0 2y
New Mills (High Peak) FP 17 362 373 +3.0% 0 2y
New Mills (High Peak) FP 18 472 476 +0.8% 0 2y
New Mills (High Peak) FP 19 1420 714 −49.7% 0 2y
New Mills (High Peak) BW 20 705 391 −44.5% 0 2y
New Mills (High Peak) FP 21 603 601 −0.3% 0 2y
New Mills (High Peak) FP 22 142 253 +78.2% 0 2y
New Mills (High Peak) FP 23 105 97 −7.6% 0 2y
New Mills (High Peak) FP 24 47 53 +12.8% 0 2y
New Mills (High Peak) FP 26 287 291 +1.4% 0 2y
New Mills (High Peak) FP 27 79 79 +0.0% 0 2y
New Mills (High Peak) BW 28 297 208 −30.0% 0 2y
New Mills (High Peak) FP 29 172 135 −21.5% 0 2y
New Mills (High Peak) FP 30 370 362 −2.2% 0 12m
New Mills (High Peak) FP 32 1523 1525 +0.1% 0 2y
New Mills (High Peak) FP 34 1407 1281 −9.0% 0 19m
New Mills (High Peak) FP 35 314 321 +2.2% 0 20m
New Mills (High Peak) FP 36 190 186 −2.1% 0 2y
New Mills (High Peak) FP 37 1092 1109 +1.6% 0 2y
New Mills (High Peak) FP 38 444 395 −11.0% 0 2y
New Mills (High Peak) RB 43 1874 1389 −25.9% 0 2y
New Mills (High Peak) FP 44 168 190 +13.1% 0 2y
New Mills (High Peak) RB 45 460 449 −2.4% 0 2y
New Mills (High Peak) FP 46 485 493 +1.6% 0 2y
New Mills (High Peak) FP 47 247 280 +13.4% 0 2y
New Mills (High Peak) FP 48 856 885 +3.4% 0 15m
New Mills (High Peak) FP 49 312 278 −10.9% 0 2y
New Mills (High Peak) BW 50 662 674 +1.8% 0 2y
New Mills (High Peak) FP 51 206 222 +7.8% 0 2y
New Mills (High Peak) FP 52 211 267 +26.5% 0 2y
New Mills (High Peak) FP 53 174 176 +1.1% 0 2y
New Mills (High Peak) BW 54 169 115 −32.0% 0 2y
New Mills (High Peak) FP 55 824 835 +1.3% 0 20m
New Mills (High Peak) FP 56 1379 949 −31.2% 0 2y
New Mills (High Peak) FP 57 700 696 −0.6% 0 2y
New Mills (High Peak) FP 58 187 201 +7.5% 0 20m
New Mills (High Peak) RB 60 607 614 +1.2% 0 2y
New Mills (High Peak) FP 61 477 1912 +300.8% 0 20m
New Mills (High Peak) FP 62 362 547 +51.1% 0 3m
New Mills (High Peak) RB 63 386 397 +2.8% 0 9m
New Mills (High Peak) FP 66 432 444 +2.8% 0 2y
New Mills (High Peak) FP 67 844 842 −0.2% 0 2y
New Mills (High Peak) FP 68 648 1411 +117.7% 0 2y
New Mills (High Peak) FP 69 478 488 +2.1% 0 2y
New Mills (High Peak) FP 70 475 66 −86.1% 0 2y
New Mills (High Peak) BW 71 441 519 +17.7% 0 2y
New Mills (High Peak) FP 73 454 354 −22.0% 0 2y
New Mills (High Peak) FP 74 228 210 −7.9% 0 2y
New Mills (High Peak) FP 75 249 255 +2.4% 0 2y
New Mills (High Peak) BOAT 76 915 918 +0.3% 0 2y
New Mills (High Peak) FP 77 910 518 −43.1% 0 8m
New Mills (High Peak) FP 78 546 116 −78.8% 0 2y
New Mills (High Peak) FP 79 146 141 −3.4% 0 2y
New Mills (High Peak) FP 80 639 648 +1.4% 0 2y
New Mills (High Peak) BW 81 95 101 +6.3% 0 2y
New Mills (High Peak) RB 82 818 819 +0.1% 0 2y
New Mills (High Peak) FP 84 179 196 +9.5% 0 2y
New Mills (High Peak) FP 85 518 509 −1.7% 0 2y
New Mills (High Peak) FP 86 254 259 +2.0% 0 9m
New Mills (High Peak) FP 87 45 48 +6.7% 0 2y
New Mills (High Peak) FP 88 598 614 +2.7% 0 2y
New Mills (High Peak) FP 89 178 183 +2.8% 0 2y
New Mills (High Peak) FP 90 112 117 +4.5% 0 2y
New Mills (High Peak) FP 91 361 367 +1.7% 0 2y
New Mills (High Peak) FP 93 1605 1540 −4.0% 0 2y
New Mills (High Peak) FP 94 262 191 −27.1% 0 2y
New Mills (High Peak) FP 95 176 162 −8.0% 0 2y
New Mills (High Peak) FP 96 359 317 −11.7% 0 2y
New Mills (High Peak) FP 97 57 70 +22.8% 0 2y
New Mills (High Peak) FP 98 168 173 +3.0% 0 2y
New Mills (High Peak) FP 99 33 41 +24.2% 0 2y
New Mills (High Peak) FP 100 140 146 +4.3% 0 2y
New Mills (High Peak) FP 101 31 49 +58.1% 0 2y
New Mills (High Peak) BW 102 393 399 +1.5% 0 21m
New Mills (High Peak) FP 103 288 294 +2.1% 0 2y
New Mills (High Peak) FP 104 198 47 −76.3% 0 2y
New Mills (High Peak) FP 105 959 1008 +5.1% 0 2y
New Mills (High Peak) FP 106 1529 1545 +1.0% 0 4m
New Mills (High Peak) FP 107 43 51 +18.6% 0 2y
New Mills (High Peak) FP 108 38 45 +18.4% 0 2y
New Mills (High Peak) FP 109 112 118 +5.4% 0 2y
New Mills (High Peak) FP 115 37 48 +29.7% 0 2y
New Mills (High Peak) BW 116 287 325 +13.2% 0 2y
New Mills (High Peak) FP 117 563 570 +1.2% 0 15m
New Mills (High Peak) FP 119 518 493 −4.8% 0 3m
New Mills (High Peak) BW 122 324 350 +8.0% 0 15m
New Mills (High Peak) FP 123 626 656 +4.8% 0 12m
New Mills (High Peak) FP 124 87 87 +0.0% 0 2y
New Mills (High Peak) FP 125 317 279 −12.0% 0 2y
New Mills (High Peak) FP 126 294 302 +2.7% 0 2y
New Mills (High Peak) BW 127 1093 1118 +2.3% 0 2y
New Mills (High Peak) FP 130 1269 1123 −11.5% 0 2y
New Mills (High Peak) FP 131 482 488 +1.2% 0 2y
New Mills (High Peak) FP 132 874 886 +1.4% 0 2y
New Mills (High Peak) FP 133 302 137 −54.6% 0 2y
New Mills (High Peak) BW 134 810 814 +0.5% 0 2y
New Mills (High Peak) FP 135 178 219 +23.0% 0 2y
New Mills (High Peak) FP 136 366 369 +0.8% 0 2y
New Mills (High Peak) FP 138 527 316 −40.0% 0 2y
New Mills (High Peak) FP 139 490 333 −32.0% 0 2y
New Mills (High Peak) FP 140 60 63 +5.0% 0 2y
New Mills (High Peak) FP 141 247 237 −4.0% 0 3m
New Mills (High Peak) BW 143 1190 1188 −0.2% 0 2y
New Mills (High Peak) BW 144 1157 1127 −2.6% 0 2y
New Mills (High Peak) BW 145 166 164 −1.2% 0 2y
New Mills (High Peak) FP 146 507 469 −7.5% 0 2y
New Mills (High Peak) FP 147 408 387 −5.1% 0 17m
New Mills (High Peak) FP 148 47 65 +38.3% 0 17m
New Mills (High Peak) FP 150 1102 606 −45.0% 0 2y
New Mills (High Peak) FP 151 72 73 +1.4% 0 17m
New Mills (High Peak) FP 153 672 61 −90.9% 0 20m
New Mills (High Peak) BW 154 1107 1120 +1.2% 0 15m
New Mills (High Peak) FP 155 335 335 +0.0% 0 2y
New Mills (High Peak) FP 156 417 422 +1.2% 0 2y
New Mills (High Peak) FP 157 901 882 −2.1% 0 2y
New Mills (High Peak) FP 158 423 428 +1.2% 0 2y
New Mills (High Peak) FP 159 215 220 +2.3% 0 2y
New Mills (High Peak) BW 160 48 54 +12.5% 0 2y
New Mills (High Peak) FP 161 795 813 +2.3% 0 2y
New Mills (High Peak) FP 162 84 55 −34.5% 0 2y
New Mills (High Peak) RB 163 1427 1410 −1.2% 0 2y
New Mills (High Peak) FP 164 641 668 +4.2% 0 2y
New Mills (High Peak) RB 165 315 240 −23.8% 0 2y
New Mills (High Peak) FP 166 113 124 +9.7% 0 21m
New Mills (High Peak) FP 167 297 439 +47.8% 0 2y
New Mills (High Peak) FP 168 247 257 +4.0% 0 2y
New Mills (High Peak) FP 169 262 275 +5.0% 0 2y
New Mills (High Peak) FP 170 198 212 +7.1% 0 2y
New Mills (High Peak) FP 173 226 233 +3.1% 0 2y
New Mills (High Peak) FP 174 672 680 +1.2% 0 2y
New Mills (High Peak) FP 175 124 140 +12.9% 0 2y
New Mills (High Peak) FP 176 284 284 +0.0% 0 2y
New Mills (High Peak) FP 177 192 200 +4.2% 0 17m
New Mills (High Peak) FP 178 266 266 +0.0% 0 7w
New Mills (High Peak) FP 179 120 46 −61.7% 0 22m
New Mills (High Peak) BW 180 1049 1062 +1.2% 0 4m
New Mills (High Peak) BW 181 1150 1164 +1.2% 0 4m
New Mills (High Peak) BW 182 30 42 +40.0% 0 3m
New Mills (High Peak) FP 184 76 89 +17.1% 0 2y
New Mills (High Peak) FP 185 159 171 +7.5% 0 2y
New Mills (High Peak) FP 186 125 83 −33.6% 0 2y
New Mills (High Peak) FP 190 215 220 +2.3% 0 2y
New Mills (High Peak) FP 191 119 104 −12.6% 0 2y
New Mills (High Peak) FP 202 126 131 +4.0% 0 9m
New Mills (High Peak) BW 205 99 109 +10.1% 0 2y
Ockbrook (Erewash) FP 1 123 131 +6.5% 0 2y
Ockbrook (Erewash) FP 2 129 92 −28.7% 0 2y
Ockbrook (Erewash) FP 3 875 961 +9.8% 0 2y
Ockbrook (Erewash) BW 4 1033 1186 +14.8% 0 5m
Ockbrook (Erewash) FP 5 298 312 +4.7% 0 2y
Ockbrook (Erewash) FP 6 62 77 +24.2% 0 2y
Ockbrook (Erewash) FP 7 226 234 +3.5% 0 2y
Ockbrook (Erewash) FP 8 915 923 +0.9% 0 2y
Ockbrook (Erewash) FP 9 394 417 +5.8% 0 2y
Ockbrook (Erewash) FP 10 85 96 +12.9% 0 2y
Ockbrook (Erewash) FP 11 291 301 +3.4% 0 2y
Ockbrook (Erewash) FP 12 255 267 +4.7% 0 2y
Ockbrook (Erewash) FP 13 811 814 +0.4% 0 2y
Ockbrook (Erewash) FP 14 1058 1063 +0.5% 0 2y
Ockbrook (Erewash) FP 15 361 391 +8.3% 0 2y
Ockbrook (Erewash) FP 16 1593 1603 +0.6% 0 2y
Ockbrook (Erewash) FP 17 1939 1961 +1.1% 0 2y
Ockbrook (Erewash) FP 18 1684 1680 −0.2% 0 17m
Ockbrook (Erewash) FP 19 298 308 +3.4% 0 2y
Ockbrook (Erewash) FP 20 566 565 −0.2% 0 5m
Ockbrook (Erewash) FP 21 1034 1030 −0.4% 0 2y
Ockbrook (Erewash) FP 22 222 235 +5.9% 0 2y
Ockbrook (Erewash) FP 23 179 168 −6.1% 0 2y
Ockbrook (Erewash) FP 24 123 135 +9.8% 0 2y
Ockbrook (Erewash) BW 25 1302 1320 +1.4% 0 4m
Ockbrook (Erewash) FP 26 982 976 −0.6% 0 2y
Ockbrook (Erewash) BW 27 652 667 +2.3% 0 2y
Ockbrook (Erewash) FP 28 36 44 +22.2% 0 2y
Ockbrook (Erewash) FP 29 239 247 +3.3% 0 2y
Ockbrook (Erewash) FP 30 77 83 +7.8% 0 2y
Ockbrook (Erewash) FP 31 31 40 +29.0% 0 2y
Ockbrook (Erewash) FP 32 1041 1038 −0.3% 0 2y
Ockbrook (Erewash) FP 33 190 199 +4.7% 0 2m
Ockbrook (Erewash) FP 34 101 106 +5.0% 0 2y
Ockbrook (Erewash) FP 36 46 62 +34.8% 0 2y
Ockbrook (Erewash) FP 37 59 70 +18.6% 0 2y
Ockbrook (Erewash) FP 38 746 749 +0.4% 0 2y
Ockbrook (Erewash) FP 39 121 111 −8.3% 0 2y
Ockbrook (Erewash) FP 40 148 120 −18.9% 0 2y
Ockbrook (Erewash) FP 41 697 722 +3.6% 0 2y
Ockbrook (Erewash) FP 42 199 213 +7.0% 0 2y
Ockbrook (Erewash) FP 44 564 585 +3.7% 0 2y
Ockbrook (Erewash) FP 56 93 105 +12.9% 0 2y
Ockbrook (Erewash) FP 57 65 80 +23.1% 0 2y
Ockbrook (Erewash) FP 58 516 530 +2.7% 0 2y
Ockbrook (Erewash) FP 59 5 6 +20.0% 0 2y
Ockbrook (Erewash) FP 62 63 76 +20.6% 0 2y
Osleston and Thurvaston (South Derbyshire) FP 21 485 480 −1.0% 0 2y
Osleston and Thurvaston (South Derbyshire) FP 22 764 386 −49.5% 0 2y
Osleston and Thurvaston (South Derbyshire) FP 23 164 175 +6.7% 0 2y
Osleston and Thurvaston (South Derbyshire) FP 24 1286 748 −41.8% 0 17m
Osleston and Thurvaston (South Derbyshire) FP 25 401 282 −29.7% 0 16m
Outseats (Derbyshire Dales) FP 6 556 543 −2.3% 0 5m
Outseats (Derbyshire Dales) FP 19 265 249 −6.0% 0 5m
Outseats (Derbyshire Dales) BOAT 52 1179 1171 −0.7% 0 4m
Risley (Erewash) FP 1 211 220 +4.3% 0 2y
Risley (Erewash) FP 2 351 356 +1.4% 0 2y
Risley (Erewash) FP 3 346 356 +2.9% 0 2y
Risley (Erewash) FP 4 445 451 +1.3% 0 2y
Risley (Erewash) BW 5 243 251 +3.3% 0 2y
Risley (Erewash) FP 6 964 968 +0.4% 0 2y
Risley (Erewash) FP 7 383 381 −0.5% 0 2y
Risley (Erewash) BW 8 1136 1143 +0.6% 0 2y
Risley (Erewash) FP 9 616 651 +5.7% 0 2y
Risley (Erewash) BW 10 484 501 +3.5% 0 2y
Risley (Erewash) FP 11 322 357 +10.9% 0 2y
Risley (Erewash) FP 12 567 560 −1.2% 0 2y
Risley (Erewash) FP 13 629 620 −1.4% 0 2y
Risley (Erewash) FP 14 712 714 +0.3% 0 2y
Risley (Erewash) FP 15 907 911 +0.4% 0 2y
Risley (Erewash) FP 16 268 278 +3.7% 0 2y
Risley (Erewash) FP 17 412 434 +5.3% 0 9m
Risley (Erewash) FP 18 448 450 +0.4% 0 16m
Sandiacre (Erewash) FP 1 354 351 −0.8% 0 5m
Sandiacre (Erewash) FP 2 653 653 +0.0% 0 9m
Sandiacre (Erewash) FP 3 216 223 +3.2% 0 2y
Sandiacre (Erewash) FP 4 166 182 +9.6% 0 9m
Sandiacre (Erewash) FP 5 138 150 +8.7% 0 9m
Sandiacre (Erewash) FP 6 227 231 +1.8% 0 9m
Sandiacre (Erewash) FP 7 290 303 +4.5% 0 9m
Sandiacre (Erewash) FP 8 377 606 +60.7% 0 2y
Sandiacre (Erewash) FP 9 462 446 −3.5% 0 5m
Sandiacre (Erewash) FP 10 174 184 +5.7% 0 2y
Sandiacre (Erewash) FP 11 190 208 +9.5% 0 2y
Sandiacre (Erewash) FP 12 732 757 +3.4% 0 2y
Sandiacre (Erewash) FP 13 53 63 +18.9% 0 2y
Sandiacre (Erewash) FP 14 231 248 +7.4% 0 9m
Sandiacre (Erewash) FP 15 71 80 +12.7% 0 9m
Sandiacre (Erewash) FP 16 389 374 −3.9% 0 9m
Sandiacre (Erewash) FP 18 62 72 +16.1% 0 9m
Sandiacre (Erewash) FP 19 3106 3109 +0.1% 0 9m
Sandiacre (Erewash) FP 20 37 40 +8.1% 0 2y
Sandiacre (Erewash) FP 21 29 36 +24.1% 0 2y
Sandiacre (Erewash) FP 23 49 66 +34.7% 0 2y
Sandiacre (Erewash) FP 24 128 135 +5.5% 0 9m
Sawley (Erewash) FP 1 384 37 −90.4% 0 2y
Sawley (Erewash) FP 2 88 98 +11.4% 0 2y
Sawley (Erewash) FP 3 117 113 −3.4% 0 2y
Sawley (Erewash) FP 4 27 37 +37.0% 0 2y
Sawley (Erewash) FP 5 126 125 −0.8% 0 2m
Sawley (Erewash) FP 6 81 89 +9.9% 0 6m
Sawley (Erewash) FP 7 181 177 −2.2% 0 2y
Sawley (Erewash) FP 8 63 75 +19.0% 0 2y
Sawley (Erewash) FP 9 167 185 +10.8% 0 2y
Sawley (Erewash) FP 10 140 153 +9.3% 0 2y
Sawley (Erewash) FP 11 119 132 +10.9% 0 2y
Sawley (Erewash) FP 12 65 69 +6.2% 0 2y
Sawley (Erewash) FP 13 39 62 +59.0% 0 2y
Sawley (Erewash) FP 14 277 277 +0.0% 0 2y
Sawley (Erewash) FP 15 1390 1363 −1.9% 0 2y
Sawley (Erewash) FP 16 738 623 −15.6% 0 2y
Sawley (Erewash) FP 17 1756 1755 −0.1% 0 2y
Sawley (Erewash) FP 19 267 270 +1.1% 0 2y
Sawley (Erewash) FP 20 1122 1115 −0.6% 0 22m
Sawley (Erewash) FP 21 369 366 −0.8% 0 2y
Sawley (Erewash) FP 22 474 471 −0.6% 0 2y
Sawley (Erewash) FP 23 209 201 −3.8% 0 2y
Sawley (Erewash) FP 24 69 112 +62.3% 0 2y
Sawley (Erewash) FP 25 303 306 +1.0% 0 2y
Sawley (Erewash) FP 27 31 37 +19.4% 0 2y
Sawley (Erewash) FP 29 48 59 +22.9% 0 5m
Shipley (Amber Valley) BW 4 1662 1694 +1.9% 0 4w
Shipley (Amber Valley) BW 5 3444 1192 −65.4% 0 2y
Shipley (Amber Valley) BW 9 1303 741 −43.1% 0 2y
Shipley (Amber Valley) BW 10 488 504 +3.3% 0 5m
Shipley (Amber Valley) FP 12 396 397 +0.3% 0 2y
Shipley (Amber Valley) FP 15 27 20 −25.9% 0 2y
Shipley (Amber Valley) BW 24 1475 94 −93.6% 0 2y
Shipley (Amber Valley) BW 25 325 329 +1.2% 0 2y
Shipley (Amber Valley) FP 33 254 253 −0.4% 0 2y
Shipley (Amber Valley) BW 40 1864 1828 −1.9% 0 10m
Shipley (Amber Valley) BW 43 818 825 +0.9% 0 2y
Shipley (Amber Valley) BW 44 653 657 +0.6% 0 2y
Shipley (Amber Valley) BW 46 319 297 −6.9% 0 2y
Shipley (Amber Valley) FP 49 591 598 +1.2% 0 2y
Shipley (Amber Valley) BW 50 469 465 −0.9% 0 2y
Shipley (Amber Valley) FP 51 456 443 −2.9% 0 2y
Shottle and Postern (Amber Valley) FP 28 239 207 −13.4% 0 2y
Stanton by Dale (Erewash) FP 1 493 495 +0.4% 0 5m
Stanton by Dale (Erewash) FP 3 143 150 +4.9% 0 2y
Stanton by Dale (Erewash) FP 4 877 898 +2.4% 0 16m
Stanton by Dale (Erewash) FP 5 1248 1239 −0.7% 0 16m
Stanton by Dale (Erewash) FP 6 231 204 −11.7% 0 2y
Stanton by Dale (Erewash) FP 7 899 888 −1.2% 0 2y
Stanton by Dale (Erewash) FP 8 556 570 +2.5% 0 2y
Stanton by Dale (Erewash) FP 9 471 478 +1.5% 0 16m
Stanton by Dale (Erewash) FP 10 121 125 +3.3% 0 2y
Stanton by Dale (Erewash) FP 11 1139 1143 +0.4% 0 2y
Stanton by Dale (Erewash) FP 12 116 119 +2.6% 0 2y
Stanton by Dale (Erewash) FP 13 176 161 −8.5% 0 2y
Stanton by Dale (Erewash) FP 14 417 432 +3.6% 0 2y
Stanton by Dale (Erewash) FP 15 1288 1292 +0.3% 0 16m
Stanton by Dale (Erewash) FP 16 115 120 +4.3% 0 2y
Stanton by Dale (Erewash) FP 17 263 261 −0.8% 0 2y
Stanton by Dale (Erewash) FP 18 1529 1213 −20.7% 0 16m
Stanton by Dale (Erewash) FP 19 201 198 −1.5% 0 2y
Stanton by Dale (Erewash) FP 20 294 298 +1.4% 0 16m
Stanton by Dale (Erewash) FP 21 1291 1288 −0.2% 0 2y
Stanton by Dale (Erewash) FP 22 157 167 +6.4% 0 2y
Stanton by Dale (Erewash) FP 23 267 271 +1.5% 0 2y
Stanton by Dale (Erewash) FP 24 305 279 −8.5% 0 14m
Stanton by Dale (Erewash) FP 25 177 189 +6.8% 0 2y
Stanton by Dale (Erewash) FP 26 31 25 −19.4% 0 2y
Stoney Middleton (Derbyshire Dales) BW 13 988 1004 +1.6% 0 5m
Stoney Middleton (Derbyshire Dales) BOAT 15 542 552 +1.8% 0 4m
Stoney Middleton (Derbyshire Dales) BW 17 1069 1059 −0.9% 0 5m
Tideswell (Derbyshire Dales) FP 14 673 669 −0.6% 0 5m
Tideswell (Derbyshire Dales) FP 15 1090 1107 +1.6% 0 2m
Tideswell (Derbyshire Dales) FP 29 1054 656 −37.8% 0 5m
Tideswell (Derbyshire Dales) FP 33 579 1074 +85.5% 0 5m
Tideswell (Derbyshire Dales) BOAT 43 916 922 +0.7% 0 5m
Tideswell (Derbyshire Dales) BOAT 45 61 75 +23.0% 0 5m
Tideswell (Derbyshire Dales) BW 46 91 92 +1.1% 0 5m
Tideswell (Derbyshire Dales) FP 49 1195 1207 +1.0% 0 5m
Tideswell (Derbyshire Dales) BW 51 1912 1913 +0.1% 0 5m
Tideswell (Derbyshire Dales) BW 52 1318 1060 −19.6% 0 5m
West Hallam (Erewash) BW 6 818 387 −52.7% 0 2y
West Hallam (Erewash) FP 7 44 36 −18.2% 0 2y
West Hallam (Erewash) FP 15 1030 1051 +2.0% 0 2y
West Hallam (Erewash) FP 18 408 392 −3.9% 0 2m
West Hallam (Erewash) FP 19 1214 1754 +44.5% 0 16m
West Hallam (Erewash) FP 22 157 172 +9.6% 0 9m
West Hallam (Erewash) BW 25 500 509 +1.8% 0 7m
West Hallam (Erewash) FP 26 315 122 −61.3% 0 2y
West Hallam (Erewash) FP 28 89 101 +13.5% 0 9m
West Hallam (Erewash) FP 31 252 47 −81.3% 0 2y
Whaley Bridge (High Peak) FP 1 591 433 −26.7% 0 2y
Whaley Bridge (High Peak) FP 2 2943 2890 −1.8% 0 22m
Whaley Bridge (High Peak) FP 3 794 806 +1.5% 0 4m
Whaley Bridge (High Peak) BW 10 1688 904 −46.4% 0 21m
Whaley Bridge (High Peak) BW 11 50 58 +16.0% 0 2y
Whaley Bridge (High Peak) FP 13 462 106 −77.1% 0 2y
Whaley Bridge (High Peak) FP 14 610 73 −88.0% 0 2y
Whaley Bridge (High Peak) FP 15 736 746 +1.4% 0 16m
Whaley Bridge (High Peak) FP 25 245 254 +3.7% 0 21m
Whaley Bridge (High Peak) FP 26 374 390 +4.3% 0 21m
Whaley Bridge (High Peak) FP 27 51 53 +3.9% 0 6y
Whaley Bridge (High Peak) FP 28 694 709 +2.2% 0 21m
Whaley Bridge (High Peak) FP 29 770 590 −23.4% 0 22m
Whaley Bridge (High Peak) FP 32 364 285 −21.7% 0 22m
Whaley Bridge (High Peak) FP 35 96 41 −57.3% 0 2y
Whaley Bridge (High Peak) FP 37 469 472 +0.6% 0 2y
Whaley Bridge (High Peak) FP 38 330 326 −1.2% 0 2y
Whaley Bridge (High Peak) FP 39 388 352 −9.3% 0 2y
Whaley Bridge (High Peak) FP 40 938 927 −1.2% 0 2y
Whaley Bridge (High Peak) FP 41 955 981 +2.7% 0 2m
Whaley Bridge (High Peak) FP 42 550 548 −0.4% 0 2y
Whaley Bridge (High Peak) FP 45 848 859 +1.3% 0 2y
Whaley Bridge (High Peak) FP 46 519 522 +0.6% 0 2y
Whaley Bridge (High Peak) FP 48 101 142 +40.6% 0 2y
Whaley Bridge (High Peak) FP 49 70 68 −2.9% 0 2y
Whaley Bridge (High Peak) FP 50 67 73 +9.0% 0 2y
Whaley Bridge (High Peak) FP 52 539 552 +2.4% 0 8m
Whaley Bridge (High Peak) FP 53 322 328 +1.9% 0 2y
Whaley Bridge (High Peak) FP 54 440 447 +1.6% 0 2y
Whaley Bridge (High Peak) FP 59 552 560 +1.4% 0 2m
Whaley Bridge (High Peak) FP 60 343 354 +3.2% 0 8m
Whaley Bridge (High Peak) FP 61 1251 1262 +0.9% 0 2y
Whaley Bridge (High Peak) FP 62 541 410 −24.2% 0 6y
Whaley Bridge (High Peak) FP 63 747 818 +9.5% 0 2y
Whaley Bridge (High Peak) FP 65 529 526 −0.6% 0 2y
Whaley Bridge (High Peak) FP 69 424 23 −94.6% 0 2y
Whaley Bridge (High Peak) FP 70 2078 2446 +17.7% 0 3m
Whaley Bridge (High Peak) RB 71 305 307 +0.7% 0 3w
Whaley Bridge (High Peak) FP 72 1319 1343 +1.8% 0 4m
Whaley Bridge (High Peak) FP 77 896 21 −97.7% 0 2y
Whaley Bridge (High Peak) RB 79 1870 1351 −27.8% 0 2m
Whaley Bridge (High Peak) FP 80 193 192 −0.5% 0 8m
Whaley Bridge (High Peak) FP 81 161 161 +0.0% 0 2y
Whaley Bridge (High Peak) FP 85 453 37 −91.8% 0 6y
Whaley Bridge (High Peak) FP 87 278 174 −37.4% 0 2y
Whaley Bridge (High Peak) FP 96 67 73 +9.0% 0 22m
Whaley Bridge (High Peak) FP 101 55 39 −29.1% 0 22m
Whaley Bridge (High Peak) FP 103 240 244 +1.7% 0 6y
Whaley Bridge (High Peak) FP 105 331 387 +16.9% 0 4m
Whaley Bridge (High Peak) FP 106 62 78 +25.8% 0 2y
Whaley Bridge (High Peak) FP 112 283 295 +4.2% 0 2y
Wheston (Derbyshire Dales) FP 3 168 179 +6.5% 0 5m
Wheston (Derbyshire Dales) BOAT 5 217 217 +0.0% 0 5m
Wheston (Derbyshire Dales) BOAT 6 1047 1039 −0.8% 0 5m
Wheston (Derbyshire Dales) BOAT 7 594 612 +3.0% 0 5m
Wheston (Derbyshire Dales) BW 8 104 105 +1.0% 0 5m
Wingerworth (North East Derbyshire) BW 47 801 437 −45.4% 0 5m
Wingerworth (North East Derbyshire) BW 50 457 466 +2.0% 0 5m
Wingerworth (North East Derbyshire) BW 52 105 108 +2.9% 0 5m
Wormhill (High Peak) BOAT 63 614 620 +1.0% 0 5m
Youlgreave (Derbyshire Dales) FP 6 1053 982 −6.7% 0 5m
Youlgreave (Derbyshire Dales) FP 7 641 650 +1.4% 0 5m